Move without the 2 a.m. cutover.
We migrate Cloud VPS workloads, shared hosting sites, databases and email. Free for Cloud VPS and Business or Agency hosting, with a written plan before anything changes.
A migration is a project, not a leap.
Inventory
We list every site, database, cron job, mailbox and DNS record. You confirm what can move and what can retire.
Build and sync
We build the target, copy data and keep it in sync. You test on a temporary hostname before cutover.
Cut over
We lower the TTL, switch DNS, and watch error rates and latency together. Rollback is a DNS change away.
Verify
A written checklist, a 7-day watch window, and the old environment kept warm until you sign off.
Supported sources.
If your stack is unusual, say so. We have moved enough strange setups to know that the inventory step is where the value is.
Included in every migration.
- A written migration plan with a rollback path
- Data copy and verification before cutover
- DNS and email cutover during a window you choose
- A 7-day watch window after the move
- No migration fee on Cloud VPS, Business and Agency hosting
- Your old environment kept available until sign-off
Before you commit.
How long does a migration take?
Is there downtime?
What if it goes wrong?
Do you migrate email?
Tell us what you are running.
We will reply with a plan, a timeline and the questions we still need answered.
